- How will the LNG physically reach Ukraine from Lithuania?
- Super-chilled LNG will be delivered by tankers to the Klaipeda FSRU, where it will be regasified back into natural gas. From there, the gas will flow through the Gas Interconnector Poland-Lithuania (GIPL), enter the Polish transmission system, and ultimately be piped into western Ukraine's vast underground storage facilities.
- Why did Naftogaz choose Lithuania instead of closer terminals in Southern Europe?
- Lithuania's Klaipeda terminal offers highly reliable, established infrastructure with direct pipeline connectivity to Ukraine via Poland. While Southern European terminals in Greece or Turkey are geographically closer to Ukraine's southern border, those routes often face intense competition for capacity and complex transit negotiations across multiple non-EU jurisdictions.
- What does this deal mean for the future of Russian gas transit through Ukraine?
- This 12-year booking signalizes that Ukraine is actively preparing for a post-transit era, as its current gas transit agreement with Russia's Gazprom is set to expire at the end of 2024. By securing long-term import capacity in the Baltics, Naftogaz is demonstrating that it can meet domestic demand without relying on Russian gas flows or transit revenues.