Overview
Second and last well of the Eni/Kogas Block 9 campaign (Saipem 10000). Also unsuccessful; the consortium suspended drilling in Block 9 afterwards. Position approximate — exact coordinates were never published.
Drilling Campaign
Drilling completed without encountering commercial hydrocarbons.
- Well Type
- Exploration
- Result
- Dry Hole
- Spud Date
- 10 Jan 2015
- Completion Date
- 27 Mar 2015
- Water Depth
- 1,600 m
- Total Depth
- 5,485 m
Operator
Other Wells in Block 9
Other Eni Wells
Drilled in
Well Data
- Type
- Exploration
- Status
- Completed
- Operator
- Eni
- Water Depth
- 1,600 m
- Total Depth
- 5,485 m
- Coordinates
- 33.75°N, 33.45°E
Latest Energy News
Leviathan's Israeli Owners Cancel $6.7B Domestic Supply Deal
Chevron's local partners in Israel's Leviathan gas and condensate field binned a potential contract to supply natural gas from the Mediterranean project to two planned domestic power plants.
Chevron and Egypt discuss next steps to speed up Mediterranean gas project
Egypt is putting its foot on the gas pedal in a bid to fast-track its Mediterranean energy hub ambitions by holding high-level talks with the U.S.-headquartered energy giant Chevron to secure an accelerated timeline to link its infrastructure to a gas field off the coast of Cyprus.
Tacoy: Plans for gas pipeline from Turkey have ‘enthused international community’
Plans for a natural gas pipeline to be constructed between Turkey and Cyprus have “generated enthusiasm within the international community”, Turkish Cypriot ‘energy minister’ Hasan Tacoy said on Thursday. “The progress of the natural gas pipeline project, the most significant step taken to meet t...