Overview
First well of the Eni/Kogas Block 9 campaign, drilled by the Saipem 10000 drillship. Found no commercial gas ("not enough gas" per the December 2014 announcement). Position approximate — exact coordinates were never published.
Drilling Campaign
Drilling completed without encountering commercial hydrocarbons.
- Well Type
- Exploration
- Result
- Dry Hole
- Spud Date
- 26 Sept 2014
- Completion Date
- 19 Dec 2014
- Water Depth
- 1,700 m
- Total Depth
- 5,800 m
Operator
Other Wells in Block 9
Other ENI Wells
Drilled in
Well Data
- Type
- Exploration
- Status
- Completed
- Operator
- ENI
- Water Depth
- 1,700 m
- Total Depth
- 5,800 m
- Coordinates
- 33.85°N, 33.55°E
Latest Energy News
Cyprus Business Now: shipping forum, fuel prices, GSI, travelling, startups, CSE
Cyprus must look beyond the immediate public cost of the Great Sea Interconnector (GSI) and consider whether the project can transform the country from an electrically isolated island into an energy hub for the Eastern Mediterranean, according to energy systems expert and former Cyprus Energy Reg...
Premier Energy books LNG cargo via Alexandroupolis FSRU
Premier Energy, based in Cyprus and listed on the Bucharest Stock Exchange, has purchased a liquefied natural gas (LNG) cargo that will be delivered to the Gastrade-operated FSRU-based terminal in Alexandroupolis, Greece, next year.
Cyprus urged to see GSI as strategic infrastructure, not just a cost
Cyprus must look beyond the immediate public cost of the Great Sea Interconnector (GSI) and consider whether the project can transform the country from an electrically isolated island into an energy hub for the Eastern Mediterranean, according to energy systems expert and former Cyprus Energy Reg...