Technical illustration of the Cronos gas field geology and development status

Cronos

In Development

Discovered in 2022 by Eni

View on Map Block 6
Share:
Resource figure
3.1 tcf
Gas in place
Discovered 2022 by Eni
Water depth 2,287 metres of water above the seabed
Everything the reservoir holds, before any recovery factor is applied. Always larger than what can actually be produced. This figure covers Cronos discovery alone, after the Cronos-2 appraisal well and its drill-stem test.

† marks a published resource figure — the panel at the top of this page and the rows above — with no primary source on file. It covers those figures and nothing else. Every other number on this page — in the prose, the milestones, the development notes and the answers — is outside it, and many of those have no source recorded at all and carry no mark either, so the absence of a mark says nothing about them. Where a field has no published figure, the absence is explained in the text and cannot be marked.

A 2C contingent resource, a gas-in-place figure and a two-field hub estimate measure different things and are never summed here. What each category means →

Overview

Discovery in Block 6 announced by Eni in August 2022; official 2025 estimate 3.1 tcf gas in place (~2–2.2 tcf recoverable base case). The most advanced Cyprus development: a subsea tieback via ~90 km pipeline to Egypt's Zohr facilities, then liquefaction at Damietta LNG for European export at ~5 bcm/yr. After the February 2025 Host Government Agreement and the October 2025 Limassol commercial deals, FID was pulled in March 2026 over liability terms but the development plan was approved by the Cyprus cabinet on 19 May 2026, with FID expected imminently. First gas is targeted for 2028.

Development Status

In Development

Field development plan approved, infrastructure under construction.

Discovered
Appraised
In Development
Producing

Ownership

Project Timeline

Aug 2022
Discovery with the Cronos-1 well in Block 6 (3.1 tcf gas-in-place)
2024
Cronos-2 appraisal confirms the resource
May 2026
Development plan approved by the Cyprus cabinet (19 May); FID imminent
~2028
First gas targeted — expected to make Cronos the first producing Cypriot field

Export Route

Subsea tie-back to Egypt's existing Zohr production facilities, with the gas liquefied at Damietta LNG for export — the fastest and lowest-capex route available to any Cypriot field.

Frequently Asked Questions

When will Cronos start producing?

First gas is targeted around 2028, which would make Cronos the first producing gas field in the history of the Cyprus EEZ. The development plan was approved by the Cyprus cabinet on 19 May 2026.

How will Cronos gas reach markets?

Via Egypt: Cronos will be tied back subsea to the Zohr field's existing processing facilities, and the gas will be liquefied at the Damietta LNG plant for export to Europe and other markets.

Wells

Consortium

Other Discoveries in Block 6

Located in

Block 6
Operated by Eni

Technical Data

Discovery
2022
Water Depth
2,287m
Resource
3.1 tcf Gas in place
Coordinates
33.53°N, 31.56°E

Related News

View all related news

Key Events

Feb 17, 2025
Cronos Host Government Agreement Signed

Eni, Egypt and Cyprus (with TotalEnergies) sign a Host Government Agreement in Cairo to develop Cronos (Block 6): gas wi...

infrastructure
Aug 22, 2022
Cronos Gas Discovery

ENI announces discovery at Cronos-1 well in Block 6, with preliminary estimates of 2.5 Tcf gas in place.

discovery