Technical illustration of the Pegasus gas field geology and development status

Pegasus

In Development

Discovered in 2025 by ExxonMobil

View on Map Block 10
Share:
Resource figure
—
No figure published
Discovered 2025 by ExxonMobil
Water depth 1,921 metres of water above the seabed
No document states a figure for Pegasus. The ministry’s Block 10 entry lists only Delphyne-1, Glaucus-1 and Glaucus-2 and gives one gas-in-place figure, for Glaucus; ExxonMobil’s own Block 10 release predates the discovery by six years. The two combined figures on record are spoken remarks relayed by the press, and the Pegasus appraisal well has not been drilled.

What has been published about the volume

documents first, newest first — these do not all agree

None of these is a published figure for this field, so this site states none.

† marks a published resource figure — the panel at the top of this page and the rows above — with no primary source on file. It covers those figures and nothing else. Every other number on this page — in the prose, the milestones, the development notes and the answers — is outside it, and many of those have no source recorded at all and carry no mark either, so the absence of a mark says nothing about them. Where a field has no published figure, the absence is explained in the text and cannot be marked.

A 2C contingent resource, a gas-in-place figure and a two-field hub estimate measure different things and are never summed here. What each category means →

Overview

Discovered by ExxonMobil and QatarEnergy in Block 10, announced 7 July 2025 (drilled by the Valaris DS-9, ~350 m gas column, 1,921 m water depth). Not yet officially quantified on its own; both fields were declared a commercial discovery on 30 June 2026. An appraisal rig is under contract with delivery expected around December 2026, and appraisal drilling is the critical path to FEED.

Development Status

In Development

Field development plan approved, infrastructure under construction.

Discovered
Appraised
In Development
Producing

Ownership

Project Timeline

Mar 2025
ExxonMobil announces the Pegasus-1 discovery in Block 10
Jun 2026
Cyprus, ExxonMobil and QatarEnergy sign the Declaration of Commercial Discovery (30 June)
Late 2026
Appraisal drilling scheduled
~2029
FID anticipated
~2033
Production targeted

Export Route

Developed jointly with Glaucus as the Block 10 hub; export concept to be fixed at FID, with LNG the leading option.

Frequently Asked Questions

What did ExxonMobil discover in Cyprus?

ExxonMobil made two gas discoveries in Block 10 of the Cyprus EEZ: Glaucus (2019) and Pegasus (March 2025). No document states a figure for Pegasus, and none states one for the two combined: the ministry publishes 3.7 Tcf of gas in place for Glaucus alone, and the combined figures of around 7 and of 8–9 tcf come from spoken remarks relayed by the press. On 30 June 2026 Cyprus, ExxonMobil and QatarEnergy signed a Declaration of Commercial Discovery moving both fields into development, with appraisal drilling from late 2026 and production targeted near 2033.

When will Pegasus be developed?

Appraisal drilling starts in late 2026, the final investment decision is anticipated around 2029, and production is targeted near 2033 as part of the joint Glaucus–Pegasus Block 10 hub.

Wells

Consortium

Other Discoveries in Block 10

Located in

Block 10
Operated by ExxonMobil

Technical Data

Discovery
2025
Water Depth
1,921m
Resource
— No figure published
Coordinates
33.44°N, 31.65°E

Latest Energy News

View all news

Key Events

Jun 30, 2026
Block 10 Fields Declared Commercial

Cyprus, ExxonMobil and QatarEnergy sign a Declaration of Commercial Discovery for the Glaucus and Pegasus fields in Bloc...

infrastructure
Jul 7, 2025
Pegasus Gas Discovery in Block 10

ExxonMobil and QatarEnergy announce the Pegasus-1 discovery in Block 10, drilled by the Valaris DS-9. Together with the...

discovery